Have any question? mbogranito@gmail.com

PART-1 :- PREPARING THE CONCRETE :

1. Clean the surface of the concrete with a vacuum Follow up with a detergent, like tri-sodium phosphate (TSP). Make sure the area is well ventilated when you use this strong chemical cleaner.

2.Check the levels on the floor to determine if the concrete is level. you will want to purchase self-leveling underlayment to create an even surface. If there are pockmarks and cracks, you will want to use some leveling compound or filler.

3.Roll or brush a latex primer onto the surface of the concrete. Some leveling underlayment products, like LevelQuick, also sell a primer to be used with their self-leveling compound. Wait for it to dry according to package directions.

4.Mix the self-leveling underlayment in a bucket or purchase it pre-mixed. Pour it in the lowest area of the concrete floor. It will seek its own level.

5.Watch where the leveling compound stops flowing. Smooth down the edges of the adjoining concrete with a smooth trowel. Wait for the leveling compound to dry completely

6.Purchase an anti-fracture membrane to lay over your leveled concrete. This will help prevent cracking of tiles. You can purchase it in sheets or in liquid form.

PART-2 :- PREPARING THE CONCRETE :

1.Snap center lines through the length and width of the room with a chalk line.

2.Unpack all your tile to check for damage and color mismatches.

3.Lay out the tile on the surface of the floor. Cover the whole surface in a thorough dry run.

4.View the edges of the tile. In almost all cases, tile must be cut near the edges to finish the tiling.

5.Adjust your center lines if the tiles near one edge are less than one-half tiles.

6.Cut your tiles near the edge of the room. If you need to make small, intricate cuts use tile nippers.

7.Check that your newly cut tile fits back into your layout before you start to lay the tile.

PART-3 :- PREPARING THE CONCRETE :

1.Remove the tile in the quarter of the room farthest away from the door. This is where you will start the installation.

2.Mix your thinset mortar. Place the bucket and a one-fourth inch notched trowel near your empty quarter.

3.Spread a three by three foot area with thinset. Smooth it over the entire area with a smooth trowel.

4.Comb the thinset using your notched trowel. The lines should be horizontal and run the same direction.

5.Set your first tile against the corner of the center line. Push down lightly to ensure it adheres.

6.Place one-fourth inch (0.6cm) tile spacers between the tiles, if you want even, thick grout lines.

7.Place the ceramic tiles down in your three by three grid. Check that they are level.

8.Move across the floor in a three foot by three foot area, working in one quarter of the room.

PART-4 :- PREPARING THE CONCRETE :

1.Allow the thinset to set for at least 24 hours before grouting.

2.Mix your grout with cool water. Make sure it is lump free before spreading it.

3.Lift grout out of the bucket with a grout float. Hold the float at a 45-degree angle.

4.Leave the grout to set for 20 minutes. Return and clean the top of the tile with a damp sponge.

5.Allow the grout to set for two hours. Buff the surface of the tile with a dry cheesecloth.

6.Seal the grout. Apply sealant to the grout with a sponge paintbrush. If you want to seal the entire.